American Estimate Hub

Openings estimates counted from every schedule.

Doors, frames, hardware, windows, and storefront takeoffs counted from schedules and elevations, organized by type, size, and rating.

Division 08 is a counting exercise with a lot of detail behind each count. We reconcile door and window schedules with floor plans and elevations so every opening is accounted for by type, size, material, fire rating, and hardware set.

Doors, frames, and hardware are listed opening by opening. Windows are counted by type and rough opening, and storefront, curtain wall, and glazing are measured by SF and LF of framing, so suppliers and installers can quote the package directly.

CSI MasterFormat divisions

  • Division 08 — Openings

What we quantify

  • Interior and exterior doors by type (EA)
  • Hollow metal and wood frames (EA)
  • Door hardware sets (EA / sets)
  • Windows by type and size (EA)
  • Storefront and curtain wall (SF / LF)
  • Overhead and rolling doors (EA)
  • Glazing and mirrors (SF)
  • Skylights and roof hatches (EA)

What the estimate accounts for

  • Schedule reconciliation: Schedules and plans do not always agree; discrepancies are listed so they can be resolved before ordering.
  • Fire ratings: Rated doors and frames are flagged by rating so labeled assemblies and hardware are priced correctly.
  • Hardware by set: Hardware is tallied by set and component, including hinges, closers, locksets, exit devices, and stops.
  • Installation conditions: Rough opening sizes, flashing, and sealant at exterior openings are noted so installation scope is not missed.

Who orders it

  • Door and hardware suppliers
  • Glazing contractors
  • General contractors
  • Home builders

Request a quote

Upload your plans and tell us the trades you need. We review the scope and reply with a written quote before any work starts.

Frequently asked questions

Do you take off door hardware?

Yes. When hardware sets are specified, we count each set and break out the components so suppliers can quote the package.

What if the schedule and plans do not match?

We note every discrepancy in the clarifications list and state which source we followed so you can confirm with the architect.

Can you estimate storefront and curtain wall?

Yes. We measure glazed area by SF and framing by LF from the elevations, and count doors, entrances, and panels within the system.